Overview
About the Project
The existing substation at Willowdale Place and the Clayhills Substation at South College Street supplies the distribution network in Aberdeen and were constructed the late 1960s. The entire outdoor electrical plant has now reached the end of its design life, with the impact of the coastal environment having taken a considerable toll on its condition, meaning maintenance is becoming increasingly challenging.
The original design of the substations does not have the functionality of modern standards, and the Clayhills substation is not able to be replaced under current standards, in its current location due to space constrictions. Therefore, we are proposing to update the Willowdale site with an improved arrangement of modern plant that accommodates both Willowdale and Clayhills GSPs. This will provide a network capable of the demands of the country’s Net Zero ambitions.
The works will comprise:
- Replacement of the four grid transformers, with more efficient modern counterparts of a higher rating
- Replacement of the open busbar arrangement with a modern indoor 132,000V (132kV) switchboard
- Upgrades to the control systems and standby systems, to provide a more reliable service
- Removal of the old outdoor equipment
- Upgrades to the site security arrangements and access road
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project Updates
Project updates
Documents
-
ssen-willowdale-gsp-consultation-event-collateral-12pp-booklet-26222-digital.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 4.3 MB
-
ssen-willowdale-gsp-consultation-event-collateral-a4-poster-26223-digital.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 611.1 KB
FAQs
FAQs
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.