Overview
About the Project
The proposed West of Beauly Asset Replacement Projects include a total of four substations requiring upgrading at Deanie, Culligran, Aigas and Kilmorack. The need for the projects is being driven by operational requirements and asset condition assessments of the existing substations serving the hydro power stations at each location.
The existing substations were built in the 1960s to connect the hydroelectric generation assets to our transmission network. The deterioration in condition of the substations poses a risk to the reliability of electricity supply.
The following elements are anticipated requirements for each of the four new substations:
- Design and construction of a new offline substation compound with 132/11kV transformer. These will be separate but linked substations
- A new 132kV circuit breaker and earth switch Control building housing 11kV switch gear and control protection equipment
- Landscaping and biodiversity requirements
- Permanent access to the sites
- Upgrade of existing and new access tracks, temporary site compounds, and construction laydown areas where required
3D Visualisation of the Project 2022
In partnership with specialist company 3DW, we created this video which allows stakeholders to visualise the new replacement substations at Deanie, Culligran, Aigas, and Kilmorack. It has been created to increase the transparency of our plans and was on display at the public consultation events held in October/November 2022. Due to stakeholder feedback received following the initial events, alternative site locations for Aigas and Kilmorack were presented at the October 2023 event.
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project Updates
Featured updates
Featured updates for this project
Project updates
Documents
PAC Reports
Consultation Documents
FAQs
FAQs
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.