Overview
About the Project
The two 30MVA 132/11kV grid transformers at St Fergus Substation form an important part of our transmission network. The existing transformers were manufactured in 1975 and have reached the end of their operational life of 40 years.
In addition to age-related concerns, the extreme coastal environment at St Fergus has contributed to the plant’s deterioration. A condition-based assessment has been carried out which found the transformers to be in poor external condition, with corrosion present.
Due to changes in specifications, it is not possible to install the replacement transformers in the same location as those currently in use. This is mainly due to the transformers now having to be housed inside a building due to their location and increased fire safety requirements.
A site selection report was commissioned to identify the most suitable option based on operational, technical, economic, and environmental assessments. Based on the information detailed in the report, we propose to locate the new 132/11kV St Fergus Substation to the west of St Fergus Gas Station and the adjacent A90.
What are Transformers?
Transformers allow us to increase and decrease the voltage of electricity when required, allowing delivery of electricity across the transmission network to be much more manageable and efficient.
Transformers vary in size, and in some cases can require specialist haulage equipment to transport them to site. Our Community Liaison Team will work alongside all local communities that may be affected by the delivery of the transformers to ensure that any disruption is kept to a minimum.
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project Updates
Project updates
Documents
-
st-fergus-brochure.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 2.5 MB
Section 37 Covering Letter & Advert
-
Covering Letter to Energy Consents Unit
- Type:
- Date:
- 01 October 2020
- Size:
- 247.1 KB
-
Section 37 Advertisement
- Type:
- Date:
- 01 October 2020
- Size:
- 89.7 KB
Section 37 Application Drawings
-
Cable Sealing End Compound General Arrangement & Elevations
- Type:
- Date:
- 01 October 2020
- Size:
- 745.6 KB
-
Location Plan and Site Plan
- Type:
- Date:
- 01 October 2020
- Size:
- 518.6 KB
-
Site Clearance Plan
- Type:
- Date:
- 01 October 2020
- Size:
- 2.6 MB
-
Temporary Diversion - Trident P1 P2 P4 & P5
- Type:
- Date:
- 01 October 2020
- Size:
- 83.2 KB
-
Temporary Diversion - Trident P3
- Type:
- Date:
- 01 October 2020
- Size:
- 86.7 KB
Environmental Appraisal & Appendices
-
Annex A - Photomontages - View 1
- Type:
- Date:
- 01 October 2020
- Size:
- 3.5 MB
-
Annex A - Photomontages - View 4
- Type:
- Date:
- 01 October 2020
- Size:
- 2.3 MB
-
Annex A - Photomontages - View 5
- Type:
- Date:
- 01 October 2020
- Size:
- 2.2 MB
-
Annex A - Photomontages - Viewpoint Setup
- Type:
- Date:
- 01 October 2020
- Size:
- 625 KB
-
Annex B1 - Extended Phase 1 Survey redacted signatures
- Type:
- Date:
- 01 October 2020
- Size:
- 1.3 MB
-
Annex B2 - Breeding Bird Survey
- Type:
- Date:
- 01 October 2020
- Size:
- 4.4 MB
-
Annex B3 - Winter VP Survey Report redacted signatures
- Type:
- Date:
- 01 October 2020
- Size:
- 1.1 MB
-
Annex B4 - Bird Species Protection Plan
- Type:
- Date:
- 01 October 2020
- Size:
- 617.7 KB
-
Annex B5 - Badger Species Protection Plan
- Type:
- Date:
- 01 October 2020
- Size:
- 635.3 KB
-
Annex C - Cultural Heritage Desk Based Assessment and Site Gazetteer
- Type:
- Date:
- 01 October 2020
- Size:
- 2.7 MB
-
Annex D1 - Flood Risk Assessment Substation
- Type:
- Date:
- 01 October 2020
- Size:
- 2.6 MB
-
Annex D2 - Flood Risk Assessment Cable Sealing End
- Type:
- Date:
- 01 October 2020
- Size:
- 2.2 MB
-
Annex F - General Environmental Management Plans
- Type:
- Date:
- 01 October 2020
- Size:
- 804.4 KB
-
Environmental Appraisal
- Type:
- Date:
- 01 October 2020
- Size:
- 9.4 MB
-
Report to inform Habitats Regulations Appraisal
- Type:
- Date:
- 01 October 2020
- Size:
- 3.3 MB
Gallery
Progress Gallery
FAQs
FAQs
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.