Skye Reinforcement
- Type:
- Transmission reinforcement
- Location:
- Highland
- Rating:
- 132kV
Upgrading the transmission network on Skye with new overhead lines, ensuring connection for renewable energy and securing power for generations.
Overview
Status: Project Refinement
Stage 3 of 5
-
Stage 1: Project Assessment: (Completed)
During the Project Assessment stage, we’re committed to evaluating potential project strategies. At this stage, we provide information about the proposed project plans on our website for stakeholders to review and provide feedback on, as well as holding in-person events within the local community demonstrating our collaborative approach to the project's development.
-
Stage 2: Early Development: (Completed)
During Early Development, we concentrate on refining the project details, based on our initial assessment of key environmental, technical, and economic factors to identify the best performing approach. We would like to gain further input from communities through accessible in-person and in some cases online consultations, which are crucial in refining our plans and strategies before advancing to the application stage.
-
Stage 3: Project Refinement: (In progress)
The Project Refinement stage is where we finalise project plans and submit the required planning applications to the relevant planning authorities. Communities and other key stakeholders can provide feedback directly to the appropriate body such as their local council and constituent representatives.
-
Stage 4: Construction Phase:
Within the construction phase we mobilise our workforce, contractors, and necessary equipment to begin construction. We maintain open channels of communication, allowing communities and stakeholders to submit feedback on the construction activities to our dedicated Community Liaison Managers, ensuring ongoing engagement to any thoughts or concerns while we carry out work in the area.
-
Stage 5: Operational Phase:
At this final stage, the project successfully moves into the operational phase, with the surrounding environment restored to its original state or better. Our Community Liaison Mangers continue to be available to address any questions or concerns, ensuring a lasting positive impact and strong community relations even after the construction activities conclude.
About the Project
We are currently developing proposals to reinforce the high voltage electricity network from Ardmore on the Isle of Skye to Fort Augustus. The existing 132kV overhead transmission line from Fort Augustus to Ardmore is the sole connection from the mainland electricity transmission system to Skye and the Western Isles, and is essential for maintaining security of supply in the area.
Recent studies into the condition of the existing infrastructure have indicated that the section of overhead line between Quoich substation and Ardmore substation requires to be rebuilt, and the existing line removed upon completion of the new line.
Furthermore, as a result of an increase in renewable energy projects requesting access to the electricity transmission network, there is a requirement to increase the capacity of the overhead line to allow renewable developments to connect.
Fort Augustus Substation to Broadford Substation
We are proposing to construct a new double circuit 132kV overhead line (OHL) comprising steel structures. The existing Fort Augustus to Skye Tee 132kV trident wood pole OHL and the existing 132kV steel lattice OHL between Skye Tee and Broadford would be dismantled and removed once the new OHL is operational.
Broadford Substation to Edinbane Substation
The existing single circuit wood pole trident 132kV OHL would be replaced with a new double circuit 132kV OHL comprising steel structures. The existing OHL would be dismantled and removed once the new OHL is operational.
Edinbane Substation to Ardmore Substation
The existing single circuit wood pole trident 132kV OHL would be replaced with a new higher capacity 132kV trident wood pole OHL. During construction, the existing OHL and its replacement would run in tandem but on energisation of the new OHL, the existing OHL would be dismantled and removed.
Why is the Project Required?
Securing Supply
The current overhead line was constructed between 1956 and 1989, and after a long service is now reaching the end of its operational capabilities. The replacement is essential to maintain security of supply to homes and businesses along its route, as well as to the Western Isles which is supplied by two subsea cables from the north of Skye.
Connecting Renewables
There is demand to connect new renewable electricity generation on Skye, which requires an increase in capacity of the overhead line.
Network for Net Zero
We intend to ‘future proof’ the replacement line to allow the connection of additional renewables to help meet government Net Zero climate change targets, supporting the transition to Net Zero emissions.
Film: Over the Hills to Skye 1978
The film, produced by the North of Scotland Hydro Electric Board (now Scottish and Southern Electricity Networks) and Balfour Beatty, illustrates the trials associated with the construction of the original line which connected the Isle of Skye to the mainland of Scotland in the 1970s.
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project Updates
Featured updates
Featured updates for this project
C1144 - CHANGE TO ROAD WORKS SCHEDULE w/c 19 November
C1144 Road Closure- Works update week commencing 18 November 2024
Glenelg - Upcoming Road Works Notification
Glengarry and Glenelg - Ground Investigation Works
Project updates
-
C1144 - CHANGE TO ROAD WORKS SCHEDULE w/c 19 November
Please note: Due to the cold weather access restrictions on the C1144 Kinloch Hourn Road will now run into Thursday 21 November 2024 on bridges Bhiora (10) and Ardochy East (10c19)A map showing the bridge locations can be found here.
Works are undertaken under the general Road Closure Order:
Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
C1144 Road Closure- Works update week commencing 18 November 2024
Please find below the the expected/planned work schedule for next week.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.
We thank all road users for passing the road works with care and at the appropriate speed which helps keeping the workforce safe.Works Update Week Commencing 18 November 2024
C1144 (Kinloch Hourn Road) - timed, localised road closure during the following dates/at the following locations:
Tuesday 19th November 2024: resurfacing of bridges Chorainn (20), Inchlaggan (30), Tomdoun (40)
Monday 18th November 2024: resurfacing of bridges Aultnaslat (50), ‘Unnamed’ (50c14), Poll-airigh (50c43), Gohbhain (60)
Wednesday 20th November 2024: resurfacing of bridges Bhiora (10), Ardochy East (10c19), Ardochy West (10c60)A map showing the bridge locations can be found here.
Traffic might also be slightly delayed in other locations on the C1144 due to tree cutting works.
Works are undertaken under the general Road Closure Order:Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.com -
C1144 Road Closure- Works update week commencing 04 November 2024
Please find below the expected/planned work schedule for week commencing 04 November 2024.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.
We thank all road users for passing the road works with care and at the appropriate speed which helps keeping the workforce safe.Works Update Week Commencing 04 November 2024
C1144 Kinloch Hourn Road:
Tue 05 – Thu 07 November: timed, localised road closure at Poll-arigh bridgeAll other bridge locations are passable with care. A map showing the bridge locations can be found here.
Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comC1144 Road Closure- Works update week commencing 28 October 2024
Please find below the the expected/planned work schedule for next week.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.
We thank all road users for passing the road works with care and at the appropriate speed which helps keeping the workforce safe.Works Update Week Commencing 28 October 2024
C1144 (Kinloch Hourn Road)
Monday - Wednesday: timed, localised road closure at Gobhain Bridge, with contractors aiming to keep closure to Monday only
Tuesday – Thursday: timed, localised road closure at Alt na H’Eiric Bridge, with contractors aiming to keep closure to Wednesday only
Friday: beam removal works at Poll-airigh Bridge might start, but contractors are expecting road to be kept open on Friday
All other bridge locations are passable with care. A map showing the bridge locations can be found here.
Works are undertaken under the general Road Closure Order:Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comC1144 Road Closure- Works update week commencing 21 October 2024
Please find below the expected/planned work schedule for next week and the week after.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.
We thank all road users for passing the road works with care and at the appropriate speed which helps keeping the workforce safe.Works Update Week Commencing 21 October 2024
C1144:
Monday/Tuesday/Wednesday: timed, localised road closure at Aultnaslat Bridge
Thursday/Friday: timed, localised road closure at Inshlaggan Bridge
All other bridge locations are passable with care. A map showing the bridge locations can be found here.
Earthworks at Ardochy Access Track will continue on Mon/Tue and might result in increased traffic due to stone deliveries.
Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comGlenelg - Upcoming Road Works Notification
This note is to inform about the following upcoming road works in and near the village of Glenelg.
Timing: works are planned to start week commencing 04 November 2024 (for the expected duration of 3 weeks)
Works locations and details:
Road leading from Bernera Bay to the Glenelg Ferry Slipway:- finishing off the road widenings which were started earlier this year
- small section of post and rail fence to secure road edge
C1223 - Road leading to Glenelg:- Extension of one existing layby
Traffic management: All of the above works will be underaken under stop/go operations. Timed, localised road closures might be required for the final laying of tar (any such closures would be communicated in advance).
A small temporary work compound will need to be set up at Bernera Bay, Glengelg, which may result in some additional traffic at the beginning and end of the works.
We thank all road users for their patience and understanding during these works and apologise for any inconvenience these works may cause.
Please direct any enquiries to skye.reinforcement@sse.comWorks update week commencing 14 October 2024 - C1144 Road Closure
Please find below the expected/planned work schedule for next week and the week after.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.We thank all road users for passing the road works with care and at the appropriate speed which helps keeping the workforce safe.
Works Update Week Commencing 14 October 2024
C1144:
Monday/Tuesday/Wednesday: timed, localised road closure at Tomdoun Bridge; other bridge locations are passable with care.
Thursday/Friday: timed, localised road closure at Aultnaslat; other bridge locations are passable with care.
A map showing the bridge locations can be found here.
Ardochy Access Track: Earthworks at the access track will result in increased traffic due to stone deliveries.Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comWorks update week commencing 07 October 2024 - C1144 Road Closure
C1144 KINLOCH HOURN ROAD WORKS
Please find below the expected/planned work schedule for the road works on the C1144 for week commencing 07 October 2024.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.We thank all road users for passing the road works with care and at the appropriate speed which helps keeping the workforce safe.
Works Update Week Commencing 07 October 2024
C1144:
Monday/Tuesday: timed, localised road closure at Tomdoun Bridge – other bridge locations are passable with care.
Wednesday/Thursday: timed, localised road closure at Chorainn Bridge – other bridge locations are passable with care.
A map showing the bridge locations can be found here.Ardochy Access Track: Earthworks at the access track will result in increased traffic due to stone deliveries (on average 5 lorries per day Mon-Fri)
Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comGlengarry and Glenelg - Ground Investigation Works
Our contractors Balfour Beatty are planning to undertake some Ground Investigation works (GI works) in the Glengarry and Glenelg area. These works are scheduled to start week commencing 7th October 2024 and are expected to run over an eight week period. The programme and a map are available on the respective links.
The works will be undertaken at bridge locations on access tracks. We do not expect these works to have any significant impact on local communities.The works are called ‘Slit Trenching’ - Slit Trenching is the process of creating a narrow trench using an excavator to determine the underlying ground conditions. This information is then used to inform the final design of transmission line and associated access.
Please address any questions to skye.reinforcement@sse.com
-
Works update week commencing 30 September 2024 - C1144 ROAD CLOSURE
C1144 KINLOCH HOURN ROAD WORKS
Please find below the expected/planned work schedule for the road works on the C1144 for week commencing 30 September 2024.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.We also thank all road users for passing the road works with care and at the appropriate speed which helps keeping the workforce safe.
Works Update Week Commencing 30 September 2024C1144: timed, localised road closure at Tomdoun Bridge – other bridge locations are passable with care. Timings of closure below, for a map see here.
C1144: Earthworks at Ardochy Access Track will result in increased traffic due to stone deliveries (on average 5 lorries per day Mon-Fri)
Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:30
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comWorks update week commencing 23 September 2024 - C1144 ROAD CLOSURE
C1144 KINLOCH HOURN ROAD WORKS
Please find below the expected/planned work schedule for the road works on the C1144 for the week commencing 23 September 2024.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.
Key change to note from previous weeks: With immediate effect the road now remains open for the weekends from FRIDAYS 12:30 (Stop/Go operations might be in place on Friday afternoons).
Week commencing 23 September 2024:C1144 Monday-Thursday: timed, localised road closure between (an including) the bridges Ardochy East and Inchlaggan (map)
C1144 Friday: timed, localised road closure between (an including) the bridges Ardochy East and Tomdoun (map)
Road Closed (Mon-Thu)
Road Open (Mon-Thu)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:00
Road Closed (Fri)
Road Open (Fri)
08:30 – 12:30
From 12:30 onwards
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comWorks update w/c 16 September 2024 - ROAD CLOSURE
C1144 KINLOCH HOURN ROAD WORKS
Please find below the expected/planned work schedule for the road works on the C1144 for the week commencing 16 September 2024.
Please note that this schedule might change at short notice as the team on the road might always face unexpected scenarios. Any significant deviations from the below will be communicated.The road closures will unfortunately need to be much more strictly enforced from this week onwards as the contractors are moving to the beam removal works which requires them to open up the entire road surface.
Week commencing 16 September 2024:
C1144: timed, localised road closure between (an including) the bridges ‘Ardochy East’ and ‘Aultnaslat’ (for a map see here)Road Closed (Mon-Fri)
Road Open (Mon-Fri)
08:30 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:00
Road remains open all day Saturday and Sunday.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
Please direct any enquiries to skye.reinforcement@sse.comWorks update for week commencing 09 September 2024 - ROAD CLOSURE
Work Update for week commencing 09 September 2024
C1144: From Tuesday 03 September - bridge strengthening works under temporary localised road closure with timed openings as follows:
Road Closed
Road Open
08:30* – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:00
*Please note: the morning road closure has been delayed from 8am to 8.30 am to allow for local requirements based on feedback recieved.
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
RJ MacLeod will minimise actual closure times as much as possible and will do their utmost to remain flexible where possible during closure times. We would be grateful for your assistance and if you could schedule any deliveries and travel accordingly where possible.
During the week commencing 09 September:
- Access will be maintained throughout the for the services mentioned in the Highland Council notice, including emergency services.
- RJ mcleod carrying out scaffolding works on C1144 Road beginning at entrance to C1144 Road A9 Access installing scaffold on bridges
- Loch Ness tree surgeons carrying out devegging works at various locations on C1144 for bridge works
- The road will be open all weekend (14/15 Sep) – Stop/Go operation might be in place during the weekend.
During the week commencing the 09 September works will be carried out in the following areas:
- Bhiora C11440010
- Ardochy East C11440010c19
- Ardochy west Bheithe C11440010c60
- Chorainn C11440020
- Inchlaggan C11440030
- Tomdoun C11440040.
The road will remain open to the East of ‘Bhiora’ bridge and to the West of ‘Ardochy East’ bridge.
For any questions please contact:
skye.reinforcement@sse.com -
Works udpate for week commencing 02 September 2024 - ROAD CLOSURE
Works pdate for week commencing 02 September 2024
C1144: From Tuesday 03 September - bridge strengthening works under temporary localised road closure with timed openings
The Highland Council road closure order reads as follows:
Road Closed
Road Open
08:00 – 12:30
12:30 – 13:30
13:30 – 17:30
17:30 – 08:00
“Access will be maintained throughout the closures for: Emergency Services, Postal Services, Waste Collection and School Transport. Other deliveries outside the opening times will be accommodated where possible to do so.“ (The Highland Council, 20 Aug 2024).
During the week commencing 02 September:
- The first day of closure is Tuesday 03 September 2024 (Road open Monday 02 September but possibly stop/go operations that day)
- The road will be open all weekend (07/08 Sep) – Stop/Go operation might be in place during the weekend.
- Access will be maintained throughout the for the services mentioned in the Highland Council notice, including emergency services.
During the week commencing the 02 September the following bridges will be worked on:
- Bhiora
- Ardochy East
The road will remain open to the East of ‘Bhiora’ bridge and to the West of ‘Ardochy East’ bridge.
For any questions please contact:
skye.reinforcement@sse.comWorks update for week commencing 12 August 2024
Works Update week commencing 12 August 2024
Please note: the planned work schedule below might be subject to change at short notice.
Glengarry (Section 4 & 5)
Faichemard Camping: Access track maintenance works to be finalised, start of start of demobilisation from site.
Kinloch Hourn Road C1144: Localised Road Closure East of Inshlaggan on 15 August, no access between 8am-5pm.
Kinloch Hourn Road C1144: West of Kingie, Trial Pit works under Stop/Go operation at two locations, short delays of up to 15mins max possible.
Glenelg/Arnisdale (Section 4)
Moyle/Ratagan: establishment of small welfare compound, vegetation clearance
For any questions please contact:
skye.reinforcement@sse.com -
Works Update week commencing 29 July 2024
Works Update week commencing 29 July 2024
Please note: the planned work schedule below might be subject to change at short notice.
Glengarry (Section 4 & 5)
Faichemard Camping: Access track maintenance works – works expected to be completed by 09 August 2024
Kinloch Hourn Road C1144: no road works week commencing 29 July 2024
Kingie Site Compound: The Delivery of a water tank on Monday 29 August is expected to be the last sizeable delivery. Further installation work ongoing on site.
*Advance notice* for the Kinloch Hourn Road C1144: Traffic Management in form of localised road closures are expected to come into force from w/c 5 August 2024. Further details will be provided as soon as they have been confirmed.
Edinbane (Section 1)
Substation: Archaeological works ongoing. (Start date 15 July, expected duration 3-4weeks)
For any questions please contact:
skye.reinforcement@sse.comWorks Update week commencing week 22 July 2024 (** last updated Mon 22 Jul)
Works Update week commencing 22 July 2024
Please note: the planned work schedule below might be subject to change at short notice.
Glengarry (Section 4 & 5)
Faichemard Camping: Access track maintenance works – Works on going.
Kinloch Hourn Road C1144: no works this week
Kingie Site Compound: potential set up of site compound (delivery of cabins) - ** now confirmed for Tuesday 23 July , please expect increased traffic and low loaders on the C1144 and approach roads.
Edinbane (Section 1)
Substation: Archaeological works commenced 15/07/24, in the area surrounding Edinbane Substation. Expected to last 3 weeks.
For any questions please contact:
skye.reinforcement@sse.comProject Update w/c 15 July 24
Works Update week commencing 15 July 2024
Please note: the planned work schedule below might be subject to change at short notice.
Glengarry (Section 4 & 5)
Faichemard Camping: Access track maintenance works – Works on going.
A87 Crossing: Access track maintenance works – Work Completed
Kinloch Hourn Road C1144: ground investigations around retaining road infrastructure (walls, gabion baskets); work locations will be under traffic management (stop/go operations); short delays possible west of Kingie. No road closures. Starting 04/07 – Work Ongoing
Glenelg and Arnisdale (Section 4)
Bernera Bay Site Compound: removal of cabins complete; final site clearance ongoing – Site cleared and removed.
Kyleakin (Section 3)
Kyle Farm (off A87): Access track maintenance works complete and site demobilised.
Sconser (Section 2)
Moll Road: Road Works, open for access only. Tarring of road completed, reinstated works ongoing.
For any questions please contact:
skye.reinforcement@sse.comWorks Update W/C 08 July 2024
Please note: the planned work schedule below might be subject to change at short notice.
Glengarry (Section 4 & 5)
Faichemard Camping: Access track maintenance works – Works on going.
Munerigie: Access track maintenance works – Works on going, completed by 12/07.
A87 Crossing: Access track maintenance works – Works on going, completed by 12/07.
Kinloch Hourn Road C1144: ground investigations around retaining road infrastructure (walls, gabion baskets); work locations will be under traffic management (stop/go operations); short delays possible west of Kingie. No road closures. Starting 04/07.
Glenelg and Arnisdale (Section 4)
Bernera Bay Site Compound: removal of cabins complete; final site clearance ongoing – Site cleared and removed
Kyleakin (Section 3)
Kyle Farm (off A87): Access track maintenance works complete. Site to be demobilised. – Site gone.
Sconser (Section 2)
Moll Road: Road Works, open for access only. RJM to commence taring road at Moll, 04/07.
Drone Survey: Possibility of a drone survey taking place (weather dependant)For any questions please contact:
skye.reinforcement@sse.com -
Works Update w/c 01 July 2024
Please note: the planned work schedule below might be subject to change at short notice. Further information on work locations are available in the works document section.
Glengarry (Section 4 & 5)
Faichemard Camping: Access track maintenance works.
Munerigie: Access track maintenance works.
A87 Crossing: Access track maintenance works.
Kinloch Hourn Road C1144: ground investigations around retaining road infrastructure (walls, gabion baskets); work locations will be under traffic management (stop/go operations); short delays possible west of Kingie. No road closures.
Glenelg and Arnisdale (Section 4)
Bernera Bay Site Compound: removal of cabins complete; final site clearance ongoing.
Kyleakin (Section 3)Kyle Farm (off A87): Access track maintenance works complete. Site to be demobilised.
Sconser (Section 2)Moll Road: Road Works, open for access only.
For any questions please contact:
Maren Ebeling, Community Liaison Manager
skye.reinforcement@sse.comWorks Update w/c 24 June 2024
Please note: the planned work schedule below might be subject to change at short notice.
Glengarry (Section 4 & 5)
Faichemard Camping (off A87): Access track maintenance works continue.
Kinloch Hourn Road C1144: Road works delayed. The road will remain open all week (please note this only refers to SSEN Transmission works).
Glenelg and Arnisdale (Section 4)
Bernera Bay Site Compound: Removal of cabins planned for Monday 24 June and Tuesday 25 June.
Kyleakin (Section 3)
Kyle Farm (off A87): Access track maintenance works. To be completed this week.
Sconser (Section 2)
Moll Road: Road Works, open for access only.
For any questions please contact:
Maren Ebeling, Community Liaison Manager
skye.reinforcement@sse.comWorks Update w/c 17 June 2024
Please note that the below is the planned work schedule which might be subject to change at short notice.Glengarry (Section 4 and 5)
Faichemard Camping (off A87): Access track maintenance works continue.
Kinloch Hourn Road C1144: Road works delayed. The road will remain open all week (please note this only refers to SSEN Transmission works).
Glenelg/Arnisdale (Section 4)
Moyle/Ratagan: Clearing of windfall timber to be completed this week.
Kyleakin (Section 3)
Kyle Farm (off A87): Access track maintenance works continue.
Broadford and Strath (Section 2 and 3)
Broadford Substation: Drone Survey work, 18-19 June 2024 (weather dependent).
Sconser (Section 2)
Moll Road: Road Works, open for access only.
Struan (Section 0/1)
Edinbane Substation: Drone Survey work, 17-19 June 2024 (weather dependent).
For any questions please contact:Maren Ebeling, Community Liaison Manager
skye.reinforcement@sse.comWorks Update w/c 10 June 2024
Please note that the below is the planned work schedule which might be subject to change at short notice.
Glengarry (Section 4 and 5)Faichemard Camping (off A87): Access track maintenance works continue. Further information on location here.
A87 (between Glengarry and Glengarry Viewpoint East): Bellmouth surveys; temporary traffic management might be in place to protect workforce. Short delays possible. Further information on locations available here.
Kinloch Hourn Road, C1144: Road works delayed. The road will remain open all week (please note this only refers to SSENT works).
Glenelg/Arnisdale (Section 4)Moyle/Ratagan: Access track maintenance work to start. Further information on location here.
Kyleakin (Section 3)Kyle Farm (off A87): Access track maintenance works continue. Further information on location here.
Sconser (Section 2)Moll Road: Road Works; road open for access only.
Sligachan: Drone survey works.
For any questions please contact:Maren Ebeling, Community Liaison Manager
skye.reinforcement@sse.com -
Works Update w/c 27 May 2024
Please note that the below is the planned work schedule which might be subject to change at short notice.
Invergarry (Section 4 and 5)Kinloch Hourn, Road C1144: Road works delayed. The road will remain open all week (please note this only refers to SSENT works).
Access Track, Faichemard Camping (off A87): Access Track Works taking place during the course of the week.
Quoich Bridge loop track: The plant will be delivered to site during the course of the week.
Glenelg (Section 4)Track at Beolary: Works finished; plant moved to Bernera Bay site compound from where it will be picked up early in the week. Pick up of plant using low loaders (planned Mon/Tue).
Bernera Bay: Welfare units now ready for movement. Pick up dates will be advised as soon as possible.
Broadford (Section 3)Proposed Accommodation Village site: Ground investigation work to inform environmental assessments. One digger on site.
Sligachan (Section 2)A87: Core trialling (continued). Traffic Management by ALBA, please expect short delays.
Sligachan:Drone Survey work (continued).
Look aheadInvergarry/Kinloch Hourn Road (Section 4 and 5): w/c 24 June transport of drilling rig.
For any questions please contact:Maren Ebeling, Community Liaison Manager
skye.reinforcement@sse.comWorks Update for week commencing 20 May 2024
Please note that the below is the planned work schedule which might be subject to change at short notice.
Invergarry (Section 4 and 5)Kinloch Hourn, Road C1144: Road works delayed. The road will remain open all week (please note this only refers to SSENT works).
Access Track, Faichemard Camping (off A87): Survey work taking place during the course of the week.
Glenelg (Section 4)Track at Beolary: Finalising capping works. Expected to be finished by Wed/Thu.
Bernera Bay: Welfare unit movement delayed. No activity this week.
Sligachan (Section 2)
A87: Core trialling (continued). Traffic Management by ALBA, please expect short delays.
Sligachan: Drone Survey work.
For any questions please contact:Maren Ebeling, Community Liaison Manager
skye.reinforcement@sse.com -
Ofgem’s decision to approve the Final Needs Case for the Fort Augustus to Skye Reinforcement Project
Following Ofgem’s decision to approve the Final Needs Case for the Fort Augustus to Skye Reinforcement Project, SSEN Transmission’s Managing Director Rob McDonald said:
“The existing Fort Augustus to Skye overhead line is fast reaching the end of its operational life, as demonstrated by two major faults in recent months which resulted in the temporary loss of power to over 20,000 customers along its route and in the Western Isles, which is supplied by two subsea cables from north Skye.
“Alongside the need to keep the lights on for homes and businesses along its route and in the Western Isles, the replacement line will also increase the capacity of the local electricity transmission network to enable the connection of new renewable electricity generation along its route. The need for this project is therefore beyond doubt and we welcome Ofgem’s final approval of need following its assessment of our robust Final Needs Case.
“We now look forward to the Scottish Government’s determination of our Section 37 planning application and remain committed to work constructively with all stakeholders to ensure the timely delivery of this critical local and national infrastructure, building on our proud heritage of powering the highlands and islands as we continue to deliver a network for net zero emissions and secure future electricity supplies across the north of Scotland.”
View Ofgem's Final Needs Case decision here
Please note that the regulatory Needs Case for the project is very much seperate to the Section 37 planning approval process, which is still under consideration by the Scottish Government's Energy Consents Unit. -
Section 37 Additional Information
Following the Section 37 application for the Skye Reinforcement Project to the Energy Consents Unit (ECU) in October 2022, four pieces of additional information has been submitted to support the application.
These additional pieces include four alternative viewing angles from Kylerhea village and Bealach, a Peat Data Report, corrected figures rectifying some inaccuracies within the forestry chapter of the EIA, and a Derogation Case submitted in relation to Section 3 (Broadford to Kyle Rhea).
The documents can be viewed on the ECU website or via the 'Project Documents' tab on the left hand site of this webpage. -
Section 37 Submission
SSEN Transmission has now applied to the Scottish Ministers for consent under Section 37 of the Electricity Act 1989 to install and keep installed approximately 160km of new overhead line and underground cabling between the existing Ardmore substation located approximately 30km northwest of Portree, to the existing Fort Augustus substation located approximately 2.5km west/southwest of Fort Augustus. This includes 110km of new double circuit 132kV overhead line supported by steel lattice towers between Fort Augustus and Broadford, 27km of new single circuit 132kV overhead line supported by trident wood poles (H poles) between Broadford and Ardmore substation, and approximately 24km of double circuit 132kV underground cable. If you wish to view the Section 37 application that we have submitted, for the overhead line, you can view each of the individual documents which make up this application in our Project Documents tab on the left hand side of this page. This can be viewed via the link below. You can also view the Section 37 application on the Energy Consents Unit’s website https://www.energyconsents.scot/ The application reference is: ECU00003395Thank you for sharing your views
Thank you for sharing your views with us
We recently launched a pre-application consultation exhibition to gain views and feedback on our proposals for Broadford Substation reinforcement and extension and Edinbane Substation reinforcement and extension.
The proposed substation works are an integral part of the Skye Reinforcement scheme, which will ensure security of supply to homes and businesses and facilitate the connection of renewable energy generation across the region. During our drop-in events held in Skeabost and Broadford on 8th September 2022, attendees were able to view key project information about our substation reinforcement and extension proposals, ask questions to the project team and share feedback ahead of submission of planning applications.
We also hosted an online Virtual Consultation Event on Monday 12th September.
Our feedback period closed on Friday 07th October, and we would like to extend thanks to all those who took the time to attend an event, or provide feedback to the team.
-
Public Consultation Events - Broadford and Edinbane Substations
We are launching a pre-application consultation exhibition to gain views and feedback on our proposals for Broadford and Edinbane Substation reinforcement and extensions. The consultation eventswill be taking place on:Thursday 8th SeptemberSkeabost Memorial Hall,10:00 – 13:00Broadford Village Hall,15:00 – 19:00. We shall also be hosting an online virtual consultation event on Monday 12th September between 5-7pm which can be accessed from the project webpage prior to the event. -
Final Needs Case Submission
SSEN Transmission has submitted to the energy regulator, Ofgem, a Final Needs Case (FNC) for the proposed replacement of the existing Fort Augustus to Skye electricity transmission line, moving towards the final stages of the regulatory funding approvals process for the proposed project. -
Report on Consultation - Alignment Selection Skye Reinforcement Project March 2022
Report on Consultation - Alignment Selection Skye Reinforcement Project March 2022This report has been prepared to provide a summary of the responses received from stakeholders (including statutory and non-statutory consultees, local communities, landowners and individual residents) during consultation between September 2021 and January 2022 in response to the preferred alignment and design solution identified for the proposed Skye Reinforcement Project between Fort Augustus Substation and Ardmore Substation on the Isle of Skye. The report can be viewed under the Project Documentation tab. -
Alignment Public Consultations
Following virtual consultations that we held in June 2020 where we presented our preferred route for the replacement overhead line (OHL) that runs from Fort Augustus to Ardmore in the north of Skye, we are pleased to now be hosting the next round of consultations across dates in September and October where we will present our proposed alignment.To find out where the consultations are taking place and to complete a feedback form on our proposals please visit the project overview page by clicking on the link below. -
Virtual Consultation Events
To continue engagement on the Skye Reinforcement project, SSEN Transmission has developed an online consultation tool, to enable the local community to experience the full exhibition from home on a computer, tablet or mobile device. The online exhibition has been designed to look and feel like a real consultation in a community hall, with exhibition boards, maps, interactive videos and the opportunity to share views on the proposals.Visitors will be able to engage directly with the project team, via a live chat function, where they can ask any questions they might have about the project and share their feedback on the current proposals. The virtual consultation events will be taking place as follows:9 June 2020 14:00 - 16:0010 June 2020 10:00 - 12:0011 June 2020 18:00 - 20:00 -
Public Consultation Events Postponed
In line with Government and medical advice regarding Covid-19, SSEN Transmission has taken the decision to limit external engagement activities. We therefore took the decision to postpone our planned engagement events for the Skye Reinforcement Project. The four events that were scheduled to take place in Skye on 16th to 19th March and those scheduled to take place in the Great Glen 24th -26th March will not go ahead. We would like to apologise for the postponement of our consultation events and will be in touch with information once they have been rearranged.Although we will not be holding the events all the materials from the planned events, presenting our proposals, is available to be downloaded from the project documentation section of this webpage .Consultation is central to the development of our projects, it is an opportunity to share our proposals with the community and hear their views. Without this valuable feedback, we would be unable to progress projects and reach a balanced proposal. We would like to reassure the local community that by postponing our planned events the opportunity to provide their feedback has not been missed. SSEN Transmission takes its responsibilities as a provider of a critical national infrastructure very seriously. The SSE group has taken steps to protect colleagues, key sites and to maintain the effectiveness of teams. We are keeping a watching brief and have a comprehensive structure firmly in place and key personnel meeting daily to reassess the situation. All of the measures we take will be guided by government advice, and our decisions will meet the overriding objective of maintaining our key operations, taking good care of our colleagues, stakeholders and the communities we serve.The consultation events in the following locations have been cancelled:• Dunvegan Hall, Dunvegan: Monday 16 March 2020, 3pm – 7pm• Aros Centre, Portree: Tuesday 17 March 2020, 3pm – 7pm• Broadford Village Hall, Broadford: Wednesday 18 March 2020, 3pm – 7pm• Kyleakin Community Hall, Kyleakin: Thursday 19 March 2020, 3pm – 7pm• Glengarry Community Hall, Glengarry: Tuesday 24 March 2020, 3pm – 7pm• Glenelg Community Hall, Glenelg: Wednesday 25 March 2020, 3pm – 7pm• Fort Augustus Village Hall, Fort Augustus: Thursday 26 March 2020, 3pm – 7pmPublic Consultation Events
SSEN Transmission is holding a series of Public Consultation Events across Skye and the Highlands to gain views and feedback on our proposals to reinforce the high voltage electricity network, from Ardmore on the Isle of Skye, to Fort Augustus. Come meet us on the following dates to hear more about the project and provide feedback: Dunvegan Hall, DunveganMonday 16 March 20203pm – 7pmAros Centre, PortreeTuesday 17 March 20203pm – 7pmBroadford Village Hall, BroadfordWednesday 18 March 20203pm – 7pmKyleakin Community Hall, KyleakinThursday 19 March 20203pm – 7pmGlengarry Community Hall, GlengarryTuesday 24 March 20203pm – 7pmGlenelg Community Hall, GlenelgWednesday 25 March 20203pm – 7pmFort Augustus Village Hall, Fort AugustusThursday 26 March 20203pm – 7pm
Documents
Project Documents
-
Glengarry_Glenelg - GI WORKS - BB - Slit Trench Programme - Oct2024.pdf
- Type:
- Date:
- 02 October 2024
- Size:
- 77.1 KB
-
Glengarry_Glenelg - GI WORKS - BB - Slit Trench Map - Oct2024.pdf
- Type:
- Date:
- 02 October 2024
- Size:
- 4.3 MB
-
C1144 Bridge Works Map - September 2024.png
- Type:
- Image
- Date:
- 16 September 2024
- Size:
- 3.3 MB
-
Section 5 - Ground Investigation Locations - Kingie - week commencing 01 June.pdf
- Type:
- Date:
- 03 July 2024
- Size:
- 540.8 KB
This document provides a map showing the locations of ground investigation works at Kingie beginning week commencing 01 July 2024.
-
Section 5 - Bellmouth Surveys - Glengarry - week commencing 10 June 2024.pdf
- Type:
- Date:
- 07 June 2024
- Size:
- 166.2 KB
This document provides a map showing the Bellmouth survey locations at Glengarry beginning week commencing 10 June 2024.
-
Section 1 - Access Track Maintenance - Glen Vic Askil.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 8.2 MB
This document provides a map showing the location of access track maintenance in Section 1 at Glen Vic Askil, produced on 05 June 2024.
-
Section 1 - Access Track Maintenance - Highfield Wood 1.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.8 MB
This document provides a map showing the location of access track maintenance in Section 1 at Highfield Wood, produced on 05 June 2024.
-
Section 1 - Access Track Maintenance - Highfield Wood 2.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.5 MB
This document provides a map showing the location of access track maintenance in Section 1 at Highfield Wood, produced on 05 June 2024.
-
Section 1 - Access Track Maintenance - Highfield Wood 3.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 8.4 MB
This document provides a map showing the location of access track maintenance in Section 1 at Highfield Wood, produced on 05 June 2024.
-
Section 3 - Access Track Maintenance - Kyle Farm 1.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 10.1 MB
This document provides a map showing the location of access track maintenance in Section 3 at Kyle Farm, produced on 30 May 2024.
-
Section 3 - Access Track Maintenance - Kyle Farm 2.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.9 MB
This document provides a map showing the location of access track maintenance in Section 3 at Kyle Farm, produced on 30 May 2024.
-
Section 3 - Access Track Maintenance - Kylerhea 1.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.8 MB
This document provides a map showing the location of access track maintenance in Section 3 at Kylerhea, produced on 30 May 2024.
-
Section 3 - Access Track Maintenance - Kylerhea 2.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 8.9 MB
This document provides a map showing the location of access track maintenance in Section 3 at Kylerhea, produced on 30 May 2024.
-
Section 4 - Access Track Maintenance - Beolary.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.6 MB
This document provides a map showing the location of access track maintenance in Section 4 at Beolary, produced on 05 June 2024.
-
Section 4 - Access Track Maintenance - Loch Coire Shubh.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 10 MB
This document provides a map showing the location of access track maintenance in Section 4 at Loch Coire Shubh, produced on 05 June 2024.
-
Section 4 - Access Track Maintenance - Moyle Ratagan.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.9 MB
This document provides a map showing the location of access track maintenance in Section 4 at Moyle Ratagan, produced on 05 June 2024.
-
Section 4 - Access Track Maintenance - Quoich Loop Road 1.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 8.2 MB
This document provides a map showing the location of access track maintenance in Section 4 at Quoich Loop Road, produced on 05 June 2024.
-
Section 4 - Access Track Maintenance - Quoich Loop Road 2.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.8 MB
This document provides a map showing the location of access track maintenance in Section 4 at Quoich Loop Road, produced on 05 June 2024.
-
Section 4 - Access Track Maintenance - SSE Tracks.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 8 MB
This document provides a map showing the location of access track maintenance in Section 5 at SSE Tracks, produced on 05 June 2024.
-
Section 5 - Access Track Maintenance - A87 Crossing.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.3 MB
This document provides a map showing the location of access track maintenance in Section 5 at A87 Crossing, produced on 09 May 2024.
-
Section 5 - Access Track Maintenance - Ardochy Forest.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.9 MB
This document provides a map showing the location of access track maintenance in Section 5 at Ardochy Forest, produced on 09 May 2024.
-
Section 5 - Access Track Maintenance - Kingie Surge Shaft.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 9.3 MB
This document provides a map showing the location of access track maintenance in Section 5 at Kingie Surge Shaft, produced on 09 May 2024.
-
Section 5 - Access Track Maintenance - Munergirie 2 and Faichemard Camping.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 10.3 MB
This document provides a map showing the location of access track maintenance in Section 5 at Munergirie 2 and Faichemard Camping, produced on 09 May 2024.
-
Section 5 - Access Track Maintenance - Munerigie 1.pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 11.4 MB
This document provides a map showing the location of access track maintenance in Section 5 at Munergirie 1, produced on 09 May 2024.
-
Section 4/5 - Public Road Improvements - Tomdoun to Quoich Bridge .pdf
- Type:
- Date:
- 06 June 2024
- Size:
- 1.4 MB
This document provides a map showing the location of public road improvements in Section 4/5 from Tomdoun to Quoich Bridge.
-
Section 4/5 - Public Road Improvements - Quoich Bridge to Loch Coire Shubh.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 273.9 KB
This document provides a map showing the location of public road improvements in Section 4/5 from Quoich Bridge to Loch Coire Shubh.
-
Skye Reinforcement Timeline - Nov 24
- Type:
- Date:
- 14 November 2024
- Size:
- 1008.4 KB
This document describes the key activities spanning from when the project was first introduced to the public, to late 2024.
-
Skye Final Needs Case - July 2023
- Type:
- Date:
- 30 July 2023
- Size:
- 1.8 MB
Final Needs Case submission to Ofgem regarding the project need.
-
Broadford & Edinbane Subs Consultation Poster - Sept 22.pdf
- Type:
- Date:
- 06 September 2022
- Size:
- 152.7 KB
Poster used to advertise the events
-
Skye Consultation Booklet - Edinbane & Broadford Subs Sept 2022.pdf
- Type:
- Date:
- 31 August 2022
- Size:
- 5.4 MB
Booklet used during pre-application consultation to gain views and feedback on our proposals for Broadford and Edinbane Substation reinforcements and extensions, in Sept 2022.
-
Kylerhea Community Meeting - Aug 22.pdf
- Type:
- Date:
- 30 August 2022
- Size:
- 2.4 MB
Slides from meeting in Kylerhea, where residents were advised we were including two route options in this area within our consent application.
-
Skye- Report on Consultation (alignment) - March 2022
- Type:
- Date:
- 30 March 2022
- Size:
- 11.8 MB
In 2022, we published our Report on Consultation, summarising responses received during consultation between Sept 2021 and Jan2022.
-
Skye Alignment Map - Sections 1-6- 2021
- Type:
- Date:
- 24 November 2021
- Size:
- 162.5 MB
This detailed map illustrates the preferred alignment for the replacement overhead line.
-
Skye Alignment Overview Map- 2021
- Type:
- Date:
- 24 November 2021
- Size:
- 31.5 MB
A high level overview map of the preferred alignment for the replacement project from 2021.
-
Skye Consultation Doc (Alignment) - September 2021.pdf
- Type:
- Date:
- 29 October 2021
- Size:
- 8.7 MB
This doc was prepared to seek views on the preferred alignment and design solution, in conjunction with public consultation throughout Sept 2021.
-
Skye - Consultation Doc (alignment) - Figures
- Type:
- Date:
- 29 September 2021
- Size:
- 33.9 MB
Proposed/Preferred Route and Baseline Alignment, Variants, Environmental Designations and Constraints figures relating to the Alignment Consultation Doc, Sep 2021.
-
Skye - Consultation Doc (alignment) - Location Plan & Viewpoints
- Type:
- Date:
- 29 September 2021
- Size:
- 93.2 MB
Photomontage viewpoints as referenced in the Consultation Doc (alignment) , Sept 2021.
-
Skye - Consultation Doc (alignment) - Preferred Alignment
- Type:
- Date:
- 28 September 2021
- Size:
- 44.8 MB
Figures showing the preferred alignment for the overhead line, Sept 2021
-
Skye Consultation Event Booklet - September/October 2021
- Type:
- Date:
- 25 September 2021
- Size:
- 16.7 MB
In Autumn 2021, we held OHL Alignment and Substation Pre-Application Consultation events across Lochaber and Skye. This booklet contains information presented during the consultation.
-
Skye Initial Needs Case- July 2021
- Type:
- Date:
- 30 July 2021
- Size:
- 9.1 MB
In July 2021, we submitted an Initial Needs Case to the energy regulator Ofgem, regarding the project to enable Ofgem to assess the project need.
-
Understanding Skye's Future Energy Ambitions Slides- 2021
- Type:
- Date:
- 01 March 2021
- Size:
- 2.2 MB
Slide pack from a seminar held in January 2021 with renewable developers
-
Skye- Report on Consultation (routeing) - Nov 2020
- Type:
- Date:
- 30 November 2020
- Size:
- 1.2 MB
In 2020, we published our Report on Consultation, summarising responses received during routeing consultation between Mid Nov 2019 and end of June 2020.
-
Skye Preferred Route Map - 2020
- Type:
- Date:
- 29 September 2020
- Size:
- 6.4 MB
A map indicating our preferred route for the replacement line from September 2020
-
Skye - Routeing Consultation Booklet - June 2020.pdf
- Type:
- Date:
- 14 July 2020
- Size:
- 1.6 MB
Consultation booklet from our virtual routeing consultation held throughout Summer 2020
Section 37 Application - Additional Information
-
Update to Annex E of Volume 5 Appendix V2-4.7 of Skye Reinforcement Project EIA Report.pdf
- Type:
- Date:
- 07 August 2023
- Size:
- 381.6 KB
-
NRP Technical Note to NatureScot - July 2023.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 364.9 KB
-
Additional Information_s37 Application_Skye Reinforcement Project_Cover Letter Aug 23.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 184.6 KB
-
Skye Reinforcement Project - Compensation Strategy.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 807.5 KB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 10of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 4.3 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 1of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 7.8 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 2of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 6.2 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 3of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 4.5 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 4of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 7.5 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 5of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 9.2 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 6of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 8 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 7of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 9.3 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 8of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 8 MB
-
Volume 5 - AppendixV2-7.2-PLHRA_v03.0 - July 2023 - 9of10.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 9.2 MB
-
Compensation Plan - Annex C - Technical Appendix.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 907.8 KB
-
Compensation Plan - Annex D - PLHRA of Compensation Areas.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 7.9 MB
-
Compensation Plan - Kinloch and Kyleakin Hills SAC Skye.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 1.1 MB
-
EIA - AI Advert - Skye Reinforcement Project August Final Agreed.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 139.2 KB
-
Compensation Plan Figure 1 - Comp Areas Overview.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 2.7 MB
-
Compensation Plan Figure 10 - Comp B CSM Results.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.4 MB
-
Compensation Plan Figure 11 - Comp C CSM Results.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.1 MB
-
Compensation Plan Figure 2 - Comp Areas Peat Depths.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 5.8 MB
-
Compensation Plan Figure 3 - Comp A NVC Results.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.9 MB
-
Compensation Plan Figure 4 - Comp B NVC Results.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.3 MB
-
Compensation Plan Figure 5 - Comp C NVC Results.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 1.7 MB
-
Compensation Plan Figure 6 - Comp A TNs.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.9 MB
-
Compensation Plan Figure 7 - Comp B TNs.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.4 MB
-
Compensation Plan Figure 8 - Comp C TNs.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.1 MB
-
Compensation Plan Figure 9 - Comp A CSM Results.pdf
- Type:
- Date:
- 01 August 2023
- Size:
- 3.8 MB
-
Additional Information FINAL Shadow Derogation Case.pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 1 MB
-
Additional Information Forestry Clarifications.pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 301.7 KB
-
Additional Information Peat Data Report.pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 6.7 MB
-
Additional Information_s37 Application_Skye Reinforcement Project_Cover Letter.pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 164.4 KB
-
Figure AI-A-3.4a-d - VL3-4 Bealach Udal (Alternative Viewing Angle).pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 6.3 MB
-
Figure AI-A-3.6a-d - VL3-6 Kylerhea Village (Alternative Viewing Angle).pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 6.6 MB
-
Figure AI-B-3.4a-d - VL3-4 Bealach Udal (Alternative Viewing Angle).pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 5.3 MB
-
Figure AI-B-3.6a-e - VL3-6 Kylerhea Village (Alternative Viewing Angle).pdf
- Type:
- Date:
- 22 February 2023
- Size:
- 5.2 MB
Section 37 Application - Planning Statement, Cover Letter and Advert
-
2022.09.30 - Application - Advert - Skye reinforcement Project.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 93.2 KB
-
Skye OHL Planning Statement 16.09.22.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.5 MB
-
Cover Letter_s37 Application_Skye Reinforcement Project_September 2022.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 226.4 KB
Section 37 Application - Non Technical Summary
-
Non-Technical Summary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.6 MB
Section 37 Application - Volumes
-
Volume 1 - Chapter 1 - Introduction and Background.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 259.6 KB
-
Volume 1 - Chapter 2 - Project Need and Strategy .pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 917.6 KB
-
Volume 1 - Chapter 3 - Project Description.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 1.3 MB
-
Volume 1 - Chapter 4 - The Routeing Process and Alternatives.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 983.5 KB
-
Volume 1 - Chapter 5 - EIA Process and Methodology.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 218.2 KB
-
Volume 1 - Chapter 6 - Scope and Consultation.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 278.7 KB
-
Volume 1 - Chapter 7 - Planning & Energy Policy Context.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 362.6 KB
-
Volume 1 - Chapter 8 - Summary of Effects.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 433.8 KB
-
Volume 1 - Main Report - Front Cover, Contents, Glossary and Preface.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 1015.4 KB
-
Volume 2 - Chapter 1 - Introduction.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 134.9 KB
-
Volume 2 - Chapter 10 - Transport.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 960.8 KB
-
Volume 2 - Chapter 11 - Socio-Economic Recreation and Tourism.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 436.8 KB
-
Volume 2 - Chapter 2 - Section by Section Overview.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 1.6 MB
-
Volume 2 - Chapter 3 - Landscape and Visual.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 754.3 KB
-
Volume 2 - Chapter 4 - Ecology.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 1.2 MB
-
Volume 2 - Chapter 5 - Ornithology .pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 486.5 KB
-
Volume 2 - Chapter 6 - Water Environment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 670.7 KB
-
Volume 2 - Chapter 7 - Geology and Soils Environment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 561.8 KB
-
Volume 2 - Chapter 8 - Cultural Heritage.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 400.8 KB
-
Volume 2 - Chapter 9 - Forestry.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 356.8 KB
-
Volume 2 - Technical Reports - Front Cover and Contents.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 901.6 KB
-
Volume 3 - Figure V1-1.1 - Overview of Proposed Development.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 8.1 MB
-
Volume 3 - Figure V1-3.1 - The Proposed Development - 1 of 3.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.4 MB
-
Volume 3 - Figure V1-3.1 - The Proposed Development - 2 of 3.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.9 MB
-
Volume 3 - Figure V1-3.1 - The Proposed Development - 3 of 3.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.3 MB
-
Volume 3 - Figure V1-4.1 - Route Options.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.7 MB
-
Volume 3 - Figure V1-4.2 - Baseline Alignment and Variants.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.3 MB
-
Volume 3 - Figure V1-5.1 - Cumulative Developments.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.3 MB
-
Volume 3 - Figure V2-3.1-S0 - Section 0 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.9 MB
-
Volume 3 - Figure V2-3.1-S1 - Section 1 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-3.1-S2 - Section 2 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.8 MB
-
Volume 3 - Figure V2-3.1-S3a - Section 3 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-3.1-S3b - Section 3 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.8 MB
-
Volume 3 - Figure V2-3.1-S4 - Section 4 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5 MB
-
Volume 3 - Figure V2-3.1-S5 - Section 5 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.1 MB
-
Volume 3 - Figure V2-3.2-S0 - Section 0 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 1.7 MB
-
Volume 3 - Figure V2-3.2-S1 - Section 1 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V2-3.2-S2 - Section 2 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7 MB
-
Volume 3 - Figure V2-3.2-S3 - Section 3 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.7 MB
-
Volume 3 - Figure V2-3.2-S4 - Section 4 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 3.1 MB
-
Volume 3 - Figure V2-3.2-S5 - Section 5 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.7 MB
-
Volume 3 - Figure V2-3.2-S6 - Section 6 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.2 MB
-
Volume 3 - Figure V2-3.3-S0 - Section 0 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.7 MB
-
Volume 3 - Figure V2-3.3-S1 - Section 1 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-3.3-S2 - Section 2 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V2-3.3-S3 - Section 3 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.7 MB
-
Volume 3 - Figure V2-3.3-S4 - Section 4 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.2 MB
-
Volume 3 - Figure V2-3.3-S5 - Section 5 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-3.3-S6 - Section 6 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4 MB
-
Volume 3 - Figure V2-3.4-S0 - Section 0 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7 MB
-
Volume 3 - Figure V2-3.4-S1 - Section 1 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.4-S2 - Section 2 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.4-S3 - Section 3 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.3 MB
-
Volume 3 - Figure V2-3.4-S4 - Section 4 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.8 MB
-
Volume 3 - Figure V2-3.4-S5 - Section 5 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.4-S6 - Section 6 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-3.5-S0 - Section 0 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 3.1 MB
-
Volume 3 - Figure V2-3.5-S1 - Section 1 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-3.5-S2 - Section 2 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-3.5-S3 - Section 3 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.1 MB
-
Volume 3 - Figure V2-3.5-S4 - Section 4 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.5-S5 - Section 5 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.6 MB
-
Volume 3 - Figure V2-4.1 - Ecological Designated Sites and Ancient Woodland within 5 km.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 3.1 MB
-
Volume 3 - Figure V2-4.2 - Carbon and Peatland Map 2016.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 2.3 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 0 - 0.01-0.11.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.2 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 0 - 0.11-0.19.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.3 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 1 - 1.01-1.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 1 - 1.09-1.16.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 2 - 2.01-2.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 2 - 2.09-2.16.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 3 - 3.01-3.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.4 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 3 - 3.09-3.15.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 4 - 4.01-4.14.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 8.6 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 4 - 4.15-4.29.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 8.8 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 5 - 5.01-5.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 5 - 5.09-5.17.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.6 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 6.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.4 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.8 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 6.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.3 MB
-
Volume 3 - Figure V2-4.5 - Bryophytes and Lichens.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-4.5 - Kinloch and Kyleakin Hills SAC-SSSI Bryophytes and Lichens.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.1 MB
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.6 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.1 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.6 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.1 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
-
Volume 3 - Figure V2-8.1-S0 - Cultural Heritage Assets in the Inner Study Area - Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5 MB
-
Volume 3 - Figure V2-8.1-S1 - Cultural Heritage Assets in the Inner Study Area - Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V2-8.1-S2 - Cultural Heritage Assets in the Inner Study Area - Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.2 MB
-
Volume 3 - Figure V2-8.1-S3 - Cultural Heritage Assets in the Inner Study Area - Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.1 MB
-
Volume 3 - Figure V2-8.1-S4 - Cultural Heritage Assets in the Inner Study Area - Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8 MB
-
Volume 3 - Figure V2-8.1-S5 - Cultural Heritage Assets in the Inner Study Area - Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.5 MB
-
Volume 3 - Figure V2-8.1-S6 - Cultural Heritage Assets in the Inner Study Area - Section 6.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 3 - Figure V2-8.2-S0 - Cultural Heritage Assets in the Outer Study Area - Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.6 MB
-
Volume 3 - Figure V2-8.2-S1 - Cultural Heritage Assets in the Outer Study Area - Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.2 MB
-
Volume 3 - Figure V2-8.2-S2 - Cultural Heritage Assets in the Outer Study Area - Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-8.2-S3 - Cultural Heritage Assets in the Outer Study Area - Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 3 - Figure V2-8.2-S4 - Cultural Heritage Assets in the Outer Study Area - Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.9 MB
-
Volume 3 - Figure V2-8.2-S5 - Cultural Heritage Assets in the Outer Study Area - Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.1 MB
-
Volume 3 - Figure V2-8.3-S0a-d - Visualisation from Trumpan Church and Burial Ground.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.2 MB
-
Volume 3 - Figure V2-8.3-S1a-d - Visualisation from Dun Arkaig Broch.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.1 MB
-
Volume 3 - Figure V2-8.3-S3a-b - Wireline from Old Corry Cairns.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.3 MB
-
Volume 3 - Figure V2-8.4-S0a-d - Visualisation toward Dun Hallin Broch from Knockbreck School.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.1 MB
-
Volume 3 - Figure V2-10.1 - Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.9 MB
-
Volume 3 - Figure V2-10.2 - Traffic Count Location Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.7 MB
-
Volume 3 - Figure V2-10.3 - Accident Location Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.7 MB
-
Volume 3 - Figure V2-10.4 - Construction Vehicle Delivery Routes.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.8 MB
-
Volume 3 - Figure V6-2.1 - The Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V6-3.1a - Alternative Alignment Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7 MB
-
Volume 3 - Figure V6-3.2a - Alternative Alignment Designated and Protected Landscapes.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V6-3.3a - Alternative Alignment Landscape Character.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 3 - Figure V6-3.4a - Alternative Alignment Visual Receptors.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.6 MB
-
Volume 3 - Figure V6-3.5 - Alternative Alignment - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.1 MB
-
Volume 3 - Figure V6-4.1 - Ecological Designated Sites and AW - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 781.8 KB
-
Volume 3 - Figure V6-4.2 - Carbon and Peatland Map 2016 - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 435.8 KB
-
Volume 3 - Figure V6-4.3 - NVC Survey - Alternative Alignment - 3.01-3.15.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.7 MB
-
Volume 3 - Figure V6-4.3 - NVC Survey - Alternative Alignment - 3.16-3.19.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.3 MB
-
Volume 3 - Figure V6-4.4 - Protected Species - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.9 MB
-
Volume 3 - Figure V6-6.1 - Local Hydrology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V6-6.2 - Regional Hydrogeology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 3 - Figure V6-6.3 - Groundwater Vulnerability.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.4 MB
-
Volume 3 - Figure V6-6.4 - GWDTE.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4 MB
-
Volume 3 - Figure V6-7.1 - Superficial Geology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V6-7.2 - Bedrock Geology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V6-7.3 - Peatland Classification.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.7 MB
-
Volume 3 - Figure V6-7.4 - Peat Depth.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.2 MB
-
Volume 3 - Figure V6-8.1 - Cultural Heritage Assets in the Inner Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
-
Volume 3 - Figure V6-8.2 - Cultural Heritage Assets in the Outer Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 4A - Figure V4A-0.1a-d - VL0-1 Trumpan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.2 MB
-
Volume 4A - Figure V4A-0.2a-d - VL0-2 Upper Feorlig.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.7 MB
-
Volume 4A - Figure V4A-1.1a-d - VL1-1 B885 at Leacan Nighean an t-Siosalaich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 4A - Figure V4A-1.2a-d - VL1-2 Mugeary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.5 MB
-
Volume 4A - Figure V4A-1.3a-d - VL1-3 Allt Dubh Viewpoint, north of Sligachan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
-
Volume 4A - Figure V4A-2.1a-d - VL2-1 Luib.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 4A - Figure V4A-2.2a-d - VL2-2 Strollamus.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.2 MB
-
Volume 4A - Figure V4A-2.3a-d - VL2-3 Srath Mor.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.9 MB
-
Volume 4A - Figure V4A-2.4a-d - VL2-4 Beinn na Caillich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 4A - Figure V4A-3.1a-d - VL3-1 A851 near Market Stance.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 4A - Figure V4A-3.2a-d - VL3-2 Cnoc a' Mhadaidh Ruaidh Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.1 MB
-
Volume 4A - Figure V4A-3.3a-d - VL3-3 Donald Murchison's Monument.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.4 MB
-
Volume 4A - Figure V4A-3.4a-d - VL3-4 Bealach Udal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.4 MB
-
Volume 4A - Figure V4A-3.5a-d - VL3-5 RSPB Otter Haven Car Park.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.4 MB
-
Volume 4A - Figure V4A-3.6a-d - VL3-6 Kylerhea Village.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 4A - Figure V4A-3.7a-d - VL3-7 Glenelg Ferry Crossing.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 4A - Figure V4A-4.1a-d - VL4-1 Glen More.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9 MB
-
Volume 4A - Figure V4A-4.2a-d - VL 4-2 Bealach Aoidhdailean.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.6 MB
-
Volume 4A - Figure V4A-4.3a-d - VL 4-3 Gleandubhlochain.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.4 MB
-
Volume 4A - Figure V4A-4.4a-d - VL 4-4 Road above Kinloch Hourn.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.8 MB
-
Volume 4A - Figure V4A-4.5a-d - VL 4-5 Loch Coire Shubh.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.5 MB
-
Volume 4A - Figure V4A-5.1a-d - VL5-1 Loch Quoich Dam.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8 MB
-
Volume 4A - Figure V4A-5.2a-d - VL5-2 Loch Lundie Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 4A - Visualisations (NatureScot) Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
-
Volume 4B - Figure V4B-0.1a-e - VL0-1 Trumpan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.4 MB
-
Volume 4B - Figure V4B-0.2a-e - VL0-2 Upper Feorlig.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 4B - Figure V4B-1.1a-e - VL1-1 B885 at Leacan Nighean an t-Siosalaich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Figure V4B-1.2a-e - VL1-2 Mugeary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.5 MB
-
Volume 4B - Figure V4B-1.3a-e - VL1-3 Allt Dubh Viewpoint, north of Sligachan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.5 MB
-
Volume 4B - Figure V4B-2.1a-e - VL2-1 Luib.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.9 MB
-
Volume 4B - Figure V4B-2.2a-e - VL2-2 Strollamus.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.5 MB
-
Volume 4B - Figure V4B-2.3a-e - VL2-3 Srath Mor.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.6 MB
-
Volume 4B - Figure V4B-2.4a-e - VL2-4 Beinn na Caillich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.6 MB
-
Volume 4B - Figure V4B-3.1a-e - VL3-1 A851 near Market Stance.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7 MB
-
Volume 4B - Figure V4B-3.2a-e - VL3-2 Cnoc a' Mhadaidh Ruaidh Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.4 MB
-
Volume 4B - Figure V4B-3.3a-e - VL3-3 Donald Murchisons Monument.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Figure V4B-3.4a-e - VL3-4 Bealach Udal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Figure V4B-3.5a-e - VL3-5 RSPB Otter Haven Car Park.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.5 MB
-
Volume 4B - Figure V4B-3.6a-e - VL3-6 Kylerhea Village.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.6 MB
-
Volume 4B - Figure V4B-3.7a-e - VL3-7 Glenelg Ferry Crossing.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.6 MB
-
Volume 4B - Figure V4B-4.1a-e - VL4-1 Glen More.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.4 MB
-
Volume 4B - Figure V4B-4.2a-e - VL4-2 Bealach Aoidhdailean.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.9 MB
-
Volume 4B - Figure V4B-4.3a-e - VL4-3 Gleandubhlochain.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.3 MB
-
Volume 4B - Figure V4B-4.4a-e - VL4-4 Road above Kinloch Hourn.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.6 MB
-
Volume 4B - Figure V4B-4.5a-e - VL4-5 Loch Coire Shubh.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8 MB
-
Volume 4B - Figure V4B-5.1a-e - VL5-1 Loch Quoich Dam.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.7 MB
-
Volume 4B - Figure V4B-5.2a-e - VL5-2 Loch Lundie Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5 MB
-
Volume 5 - Appendix V2-10.1 - Transport Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.3 MB
-
Volume 5 - Appendix V2-11.1 - Outdoor Access Management Plan - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
-
Volume 5 - Appendix V2-11.1 - Outdoor Access Management Plan - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.6 MB
-
Volume 5 - Appendix V2-11.2 - Socio-Economic Baseline.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 249.7 KB
-
Volume 5 - Appendix V2-11.3 - Recreation and Tourism Baseline.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Reports.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 167.7 KB
-
Volume 5 - Appendix V6-2.1 - Indicative Tower Schedule (Alternative Alignment).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 189.5 KB
-
Volume 5 - Appendix V6-3.1 Landscape Character Assessment (Alternative Alignment).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 242.7 KB
-
Volume 5 - Appendix V6-3.2 Visual Receptor Assessment (Alternative Alignment).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 346.2 KB
-
Volume 5 - Appendix V6-6.2 - Alternative Alignment Schedule of Permanent Watercourse Crossings.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.6 MB
-
Volume 5 - Appendix V6-6.4 - Alternative Alignment GWDTE Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 472.8 KB
-
Volume 5 - Appendix V6-8.1 - Scope and Methodology of Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 214.3 KB
-
Volume 5 - Appendix V6-8.2 - Cultural Heritage Assets in the Inner Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 253 KB
-
Volume 5 - Appendix V6-8.3 - Designated Cultural Heritage Assets in the Outer Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 127.2 KB
-
Volume 5 - Appendix V6-8.4 - Cultural Heritage References.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 55.8 KB
-
Volume 5 - Appendix V6-9.1 - Kyle Farm and Mudalach Woodland Report - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.6 MB
-
Volume 5 - Technical Appendices - Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 952.2 KB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1A Balmeanach.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.8 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1B Glenvicaskill.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1C Mugeary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1D Glenvarragill.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1E Broadford West.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 931 KB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1F Riverside and Old Corry.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1H Bernera Farm.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.8 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1I Towers BF95-BF96.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.5 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1J Scallasaig.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.8 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1K Eileanreach.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1L Arnisdale.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex G Kyle Farm & Mudalach.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1M Kinlochourn.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.1 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1N Glenquoich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.2 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1O Tomdoun & East Glenquoich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.2 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1P Lochan Torr.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1Q Ardochy.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.6 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1R Druim Buidhe.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1S Leacan Dubha.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1T Kilfinnan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.5 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report Annex 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 115.7 KB
-
Volume 5 - Appendix V2-5.1 - Ornithology Technical Report Apr-16 to Mar-19 - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6 MB
-
Volume 5 - Appendix V2-5.1 - Ornithology Technical Report Apr-16 to Mar-19 - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 5 - Appendix V2-5.2 - Ornithology Technical Report Apr-16 to Dec-18.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5 MB
-
Volume 5 - Appendix V2-5.3 - Ornithology Technical Report Jan to Aug 2021.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.1 MB
-
Volume 5 - Appendix V2-5.4 - Shadow Habitats Regulations Appraisal for the Cuillins SPA.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.3 MB
-
Volume 5 - Appendix V2-5.5 - Shadow Habitats Regulations Appraisal for the West Inverness-shire Lochs SPA.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.1 MB
-
Volume 5 - Appendix V2-6.1 - Methodology for Assessing Significance of Effect.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 453.4 KB
-
Volume 5 - Appendix V2-6.2 - Schedule of Permanent Water Crossings.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V2-6.4 - GWTDE Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 463.9 KB
-
Volume 5 - Appendix V2-7.1 - Significance Criteria.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 445.4 KB
-
Volume 5 - Appendix V2-7.2 - Peat Landslide Hazard and Risk Assessment - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.7 MB
-
Volume 5 - Appendix V2-7.2 - Peat Landslide Hazard and Risk Assessment - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 5 - Appendix V2-7.3 - Peat and Carbon Management Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.5 MB
-
Volume 5 - Appendix V2-8-1 - Scope and Methodology of Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 283.7 KB
-
Volume 5 - Appendix V2-8-2 - Cultural Heritage Assets in the Inner Study Area .pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-8-3 - Designated Cultural Heritage Assets in the Outer Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 339.8 KB
-
Volume 5 - Appendix V2-8-4 - Cultural Heritage References .pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 111.8 KB
-
Volume 5 - Appendix V2-3.10 - LVIA of Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 953.5 KB
-
Volume 5 - Appendix V2-3.11 - LVIA of Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 865.5 KB
-
Volume 5 - Appendix V2-3.12 - LVIA of Section 6.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 290.1 KB
-
Volume 5 - Appendix V2-3.13 - Landscape and Visual Mitigation Measures.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 162.4 KB
-
Volume 5 - Appendix V2-3.14 - Landscape and Visual Reference List.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 112.8 KB
-
Volume 5 - Appendix V2-3.6 - LVIA of Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 817.5 KB
-
Volume 5 - Appendix V2-3.7 - LVIA of Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 733.1 KB
-
Volume 5 - Appendix V2-3.8 - LVIA of Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1 MB
-
Volume 5 - Appendix V2-3.9 - LVIA of Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 881.4 KB
-
Volume 5 - Appendix V2-4.1 - Legislation Policy + Guidance.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 129.2 KB
-
Volume 5 - Appendix V2-4.2 - Assessment Methodology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 190.4 KB
-
Volume 5 - Appendix V2-4.3 - NVC and Habitats Survey Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 964.5 KB
-
Volume 5 - Appendix V2-4.4 - Protected Species Survey Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 874.5 KB
-
Volume 5 - Appendix V2-4.5 - Watercourse Crossing Fish Habitat Survey.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.7 MB
-
Volume 5 - Appendix V2-4.6 - Kinloch and Kyleakin Hills SAC Bryophyte & Lichen Survey Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.5 MB
-
Volume 5 - Appendix V2-4.7 - Kinloch and Kyleakin Hills SAC Shadow HRA Figures - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V2-4.7 - Kinloch and Kyleakin Hills SAC Shadow HRA Figures - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 5 - Appendix V2-4.7 - Kinloch and Kyleakin Hills SAC Shadow HRA.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V1-3.1 - Indicative Pole and Tower Schedule.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 755.4 KB
-
Volume 5 - Appendix V1-3.2 - Further Engineering Design Information.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.1 MB
-
Volume 5 - Appendix V1-3.3 - Preliminary Appraisal of Borrow Pits Quarry and Site Compounds.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V1-3.4 - Preliminary Appraisal of Public Road Improvement Works.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.3 MB
-
Volume 5 - Appendix V1-3.5 - General Environmental Management Plans (GEMPs) and Species Protection Plans (SPPs).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7 MB
-
Volume 5 - Appendix V1-3.6 - Schedule of Mitigation Measures.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 475.2 KB
-
Volume 5 - Appendix V1-3.7 - Outline Site Restoration Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 996.1 KB
-
Volume 5 - Appendix V1-3.8 - Dismantling Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 5 - Appendix V1-3.9 - Outline CEMP.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 122.4 KB
-
Volume 5 - Appendix V1-4.1 - Alternative Technology Options and Design Solutions.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 697.2 KB
-
Volume 5 - Appendix V1-5.1 - EIA Team.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 138.2 KB
-
Volume 5 - Appendix V1-6.1 - Public Consultation Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 5 - Appendix V1-6.2 - Scoping Report Part 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V1-6.2 - Scoping Report Part 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9 MB
-
Volume 5 - Appendix V1-6.3 - Scoping Opinion.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.4 MB
-
Volume 5 - Appendix V1-6.4 - Scoping Matrix.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 596.2 KB
-
Volume 5 - Appendix V1-6.5 - Gate Check Report - May 2022.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 5 - Appendix V2-3.1 - Landscape and Visual Scoping Appraisal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 411.7 KB
-
Volume 5 - Appendix V2-3.2 - LVIA Methodology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 269.9 KB
-
Volume 5 - Appendix V2-3.3 - Technical Methodologies for Visual Representation.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 272.6 KB
-
Volume 5 - Appendix V2-3.4 - Landscape Character Types Sensitivity Appraisal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 320.8 KB
-
Volume 5 - Appendix V2-3.5 - Assessment of Designated and Protected Landscapes.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 553.5 KB
-
Volume 6 - Chapter 1 - Introduction - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 123.1 KB
-
Volume 6 - Chapter 10 - Transport - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 123.9 KB
-
Volume 6 - Chapter 11 - Socio-Economic Recreation and Tourism - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 280.2 KB
-
Volume 6 - Chapter 2 - Project Description - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 473.3 KB
-
Volume 6 - Chapter 3 - Landscape and Visual - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 434.5 KB
-
Volume 6 - Chapter 4 - Ecology - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 934 KB
-
Volume 6 - Chapter 5 - Ornithology - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 241.9 KB
-
Volume 6 - Chapter 6 - Water Environment - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 342.6 KB
-
Volume 6 - Chapter 7 - Geology and Soils Environment - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 349.3 KB
-
Volume 6 - Chapter 8 - Cultural Heritage - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 196.3 KB
-
Volume 6 - Chapter 9 - Forestry - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 151.9 KB
-
Volume 6 - Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 940.9 KB
Works
Planning stage and maintenance works (General Information)
The proposed Skye Reinforcement Project will be a major civil engineering project. Whilst the Scottish Government’s Energy Consent Unit’s determination of the Section 37 Application for the Skye Reinforcement Project is outstanding, SSEN Transmission is going to undertake works in the planning stage of significant engineering projects.
Regardless of the decision on the Section 37 application, access to the existing Skye overhead line will be required in order to undertake more frequent detailed inspections of the ageing and failing asset.
Works will include:
- Public Road Improvements works,
- maintenance of access tracks (maps are available in Project Documents) and
- ground investigation works (both intrusive and unintrusive).
All works are undertaken under Permitted Development Rights and we will be working closely with local communities, relevant departments in The Highland Council (e.g. Road, Planning, Access), Statutory Partners and Land Owners. All works are subject to pre-commencement environmental surveys, and suitable mitigations will be implemented where necessary.
We will communicate all works through the ‘Project updates’ section of this webpage (see ‘Project Update’ tab above) where the works details will be available.
Works Types
-
The existing Skye Overhead Line is serviced by many existing access tracks. These tracks, over the years, have become overgrown and are in many locations no longer suitable for vehicular traffic.
The scope of maintenance may include trimming trees/felling where trees pose a risk to the access track, removal of overgrown vegetation and scraping back to original hard core, clearing out and re-establishing drainage ditches, ripping and compacting existing track surfaces where possible and capping existing tracks with a fresh layer stone to smooth out any dips in the existing track layout and provide a fresh running surface for safe access.
Silt mitigation measures may also be introduced to ensure compliance with SEPA Controlled Activity Regulations.
Please note that due to overgrowth, current tracks might appear narrower than what they are. Also, the overgrowth has given the access tracks a ‘natural look’ – after any maintenance works the track will look different.
Maps showing those access tracks we propose to work on in Spring/Summer 2024 are available under 'Project Documents'.
-
These works include assessing selected public roads with regards to their suitability to accommodate construction traffic. It will take into account the condition of the road, the width and availability of passing places. If found that the road in their current condition is not suitable for construction traffic ‘Public Road Improvement’ works will be undertaken – depending on location and outcome of the assessment this may include work on new and existing passing places, road widenings, road repairs.
We work closely with The Highland Council’s Road Department and in many cases road works undertaken by SSEN Transmission go well beyond the project’s requirements, but also include general improvement works (e.g. pothole repairs).
Traffic management will be required for any roadworks which will be communicated in advance and we will liaise with local communities on any additional measures that will help minimise the impact. Access for key services including emergency access will be provided at all times (even under road closures). All traffic management measures will be discussed and agreed with The Roads Authority and communicated through the appropriate channels.
-
In order to inform the final technical design and proposed approaches ground investigations are required. The nature of ground investigations would range from visual inspection (surveys) to more intrusive ‘core trials’ (bore trials) depending on the location and proposed infrastructure.
The most intrusive ground investigation works are likely to take place at substation locations and proposed underground cable sections.
These works are undertaken with land owner permission and after consultation with statutory organisations (e.g. NatureScot, SEPA, Forest and Land Scotland). Usually these works do not require planning permission but planning consent will be obtained where required. We will also inform local communities where these works have a direct impact on residents.
Drone technology is used in some survey work following the regulations set out in the Air Navigation Order 2016 (as amended) for flying a drone, including privacy considerations.
-
Those contractors undertaking works will in some cases be required to set up welfare compounds for their workers, as required by the Health and Safety at Work Act and Construction Design Management Regulations. The sites will also be used as laydown areas for plant and materials.
These compounds will be set up in line with statutory requirements and we will be working with local communities to mitigate any potential negative local impacts.
FAQs
FAQs
-
SSEN Transmission is responsible for maintaining and investing in the electricity transmission network in the north of Scotland and our network extends over a quarter of the UK’s land mass, crossing some of its most challenging terrain.
Our operating area is home to vast renewable energy resources, and this is being harnessed by wind, hydro and marine generation. Working closely with National Grid Electricity System Operator (the 'ESO'), we enable electricity generators to connect to the transmission system, allowing the electricity generated by them to be transported to areas of demand across the country. -
Following a minority stake sale which completed in November 2022, SSEN Transmission is now owned 75% by SSE plc and 25% by Ontario Teachers’ Pension Plan Board.
SSE plc sold its UK domestic electricity and gas retail business, along with domestic energy services to OVO Energy in January 2020 and no longer manages these customer accounts.
-
It’s the highest voltage electricity network in the UK – the ‘motorway network’ of the energy world. It transmits large quantities of electricity over long distances via wires carried on a system of mainly metal towers (pylons) and large substations. Transmission voltages in Scotland are 132kV, 275kV and 400kV. Larger generation schemes usually connect to the Transmission system.
The lower voltage parts of the system are called distribution networks. In Scotland, these local networks operate below 132kV whereas in England the distribution network includes 132kV.
-
As a stakeholder-led business, throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing new projects, we want to understand what local people think about our plans.
We always endeavour to take the time to discuss our proposals with local community councils and the wider affected community and to carry out engagement throughout each of the development stages, listening to feedback before finalising project plans. The feedback we receive is vital to help us develop proposals that reflect the views of a variety of stakeholder.
-
To find out more about a project, visit our project web pages which can be searched by location or area. Each project has a dedicated Community Liaison Manager that you can contact. You can find their contact details in the individual project pages, where you can also sign up to project updates.
Project Contacts
Maren Ebeling | Community Liaison Manager
Telephone: 07721 462330
Address: 10 Henderson Road, Inverness, IV1 1SN
Ali MacLeod | Land Manager
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.