Upgrading infrastructure for Connagill Cluster, delivering energy reliability and supporting the transition to net zero.
Overview
About the Project
The Connagill Cluster comprises the recently consented Strathy Wood (65 megawatt (MW)) and Strathy South (208MW) Wind Farms, as well as the proposed Armadale (58MW), Melvich (58MW) and Kirkton (53MW) Wind Farms.
Optioneering studies have been ongoing since 2021 to connect the consented Strathy South, Strathy Wood, and proposed Armadale Wind Farms to the transmission network. The initial optimal technology solution for each connection was via overhead line supported by trident ‘H’ wood pole, which was presented to statutory consultees in 2022 during an informal project update.
Since then, two further connections have been agreed for the proposed Melvich and Kirkton Wind Farms, and it is no longer the optimal solution from a technical, operational, or environmental perspective to have numerous separate wood pole overhead lines running in parallel for long distances for each connection. Extensive further review has, therefore, been carried out to identify a rationalised approach to facilitate all the connections.
Why is the Project Required?
Under our Network Operators Licence we are required to provide connections for five proposed wind farms in the Strathy area, collectively known as the Connagill Cluster.
These connections should be delivered in a technically efficient, co-ordinated, and economic manner, whilst having the least practicable impact on people and the environment. All connections are to be provided at 132kV and are proposed to be accommodated on wood pole and steel lattice overhead lines.
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Documents
2024 Public Consultation Documents
-
Report on Consultation (Alignment Stage) September 2024.pdf
- Type:
- Date:
- 15 October 2024
- Size:
- 4.6 MB
-
Conngaill Cluster Grid Connections - Alignment.pdf
- Type:
- Date:
- 30 July 2024
- Size:
- 2.7 MB
This Alignment Consultation Document (and associated appendices/maps) explains the project need and summarises the process which has been followed to arrive at the optimal alignment. It forms part of the consultation exercise which provides all interested parties with the opportunity to provide feedback.
-
Report on Consultation (Routeing Stage) - Connagill Cluster - April 2024.pdf
- Type:
- Date:
- 27 May 2024
- Size:
- 9.7 MB
This Route Consultation Document (and associated appendices/maps) explains the project need and summarises the process which has been followed to arrive at the optimal route. It forms part of the consultation exercise which provides all interested parties with the opportunity to provide feedback.
-
Connagill Cluster Mailer-V3 (005).pdf
- Type:
- Date:
- 08 May 2024
- Size:
- 430 KB
This document provides an update to our stakeholders about the project, produced May 2024
-
SSEN - Connagill Cluster - April 2024 - Booklet - 28212 - ARTWORK Digital pages (002).pdf
- Type:
- Date:
- 08 May 2024
- Size:
- 6.8 MB
This document provides information to our stakeholders about the project and was provided during our consultation in May 2024
-
Appendix 1 - SS+SW 'Southern' Section - Comparative Alignment Appraisal.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 330.5 KB
-
Appendix 2 - SS+SW 'Northern' Section - Appraisal of Modified Alignment.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 314.8 KB
-
Appendix 3 - SS+SW 'Alternative Northern' Section - Comparative Alignment Appraisal.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 445.3 KB
-
Appendix 4 - Armadale - Comparative Alignment Appraisal.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 352.8 KB
-
Appendix 5 - Kirkton Grid Connection - Comparative Alignment Appraisal.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 275.9 KB
-
Appendix 6 - Strathy Switching Station - Comparative Site Appraisal.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 322.2 KB
-
Figure 1.1 – Strathy South and Strathy Wood Grid Connections ‘Southern Section’ - Proposed Route and Alignment Options.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 1.9 MB
-
Figure 1.2 - Strathy South and Strathy Wood Grid Connections ‘Southern Section’ - Optimal Alignment.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 3 MB
-
Figure 2.1 – Strathy South and Strathy Wood Grid Connections ‘Northern Section’ – Optimal Alignment.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 3.3 MB
-
Figure 2.2 - Strathy South and Strathy Wood Grid Connections ‘Northern Section’ – Proposed Alternative Route and Alternative Alignment Options.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 1.7 MB
-
Figure 2.3 - Strathy South and Strathy Wood Grid Connections ‘Northern Section’ – Optimal and Optimal Alternative Alignment.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 3.2 MB
-
Figure 3.1 – Armadale Grid Connection - Proposed Route Alignment Options.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 1.6 MB
-
Figure 3.2 – Armadale Grid Connection - Optimal Alignment -.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 2.4 MB
-
Figure 4.1 – Kirkton Grid Connection - Alignment Options.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 1.7 MB
-
Figure 4.2 – Kirkton Grid Connection - Optimal Alignment.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 1 MB
-
Figure 5.1 – Strathy Switching Station – Site Options.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 2.4 MB
-
Figure 5.2 – Strathy Switching Station – Optimal Site.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 2.4 MB
-
Figure 6.0 – Combined Connagill Cluster Grid Connections.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 3.8 MB
-
Figure 7.1a+b - VP1 - Viewpoint from Bowside Lodge.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 9.8 MB
-
Figure 7.2a+b - VP2 - Viewpoint from Strathy Cemetery.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 8.4 MB
-
Figure 7.3a+b - VP3 - Viewpoint from A897 near Golval.pdf
- Type:
- Date:
- 16 September 2024
- Size:
- 7.5 MB
Project Documents
-
Connagill Cluster Grid Connections - Routeing Consultation Document.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 2.9 MB
-
Appendix 1 - Strathy South and Strathy Wood Grid Connections Southern Section - Comparative Route Appraisal.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 219.1 KB
-
Appendix 2 - Strathy South and Strathy Wood Grid Connections Alternative Northern Section - Comparative Route Appraisal.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 280.6 KB
-
Appendix 3 - Armadale Grid Connection - Comparative Route Appraisal.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 268.3 KB
-
Figure 2.1 - Environmental Baseline - Natural Heritage Designations.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 7.9 MB
-
Figure 2.3 - Environmental Baseline - Peatland Classification.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.8 MB
-
Figure 2.5 - Environmental Baseline - Landscape Designations.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.7 MB
-
Figure 2.6 - Environmental Baseline - Landscape Character Types.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.8 MB
-
Figure 2.7 - Environmental Baseline - Visual Receptors.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.7 MB
-
Figure 2.8 - Environmental Baseline - Landuse and Recreation.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 8 MB
-
Figure 2.9 - Environmental Baseline - Forestry and Woodland.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.8 MB
-
Figure 3.1 - Strathy South and Strathy Wood Grid Connections 'Southern Section' Route Options.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.8 MB
-
Figure 3.2 - Strathy South and Strathy Wood Grid Connection 'Southern Section' Optimal Route Option.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.8 MB
-
Figure 4.1 - Strathy South and Strathy Wood Grid Connection 'Northern Section' Optimal Route Option.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 3.5 MB
-
Figure 4.2 - Strathy South and Strathy Wood Grid Connection 'Northern Section' Alternative Route Op.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.9 MB
-
Figure 4.3 - Strathy South and Strathy Grid Connection 'Northern Section' - Optimal Alternative Route.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.9 MB
-
Figure 5.1 - Armadale Connection Route Options.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 2.8 MB
-
Figure 5.2 - Armadale Connection Preferred Route.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 2.8 MB
-
Figure 6 - Combined Connagill Cluster Grid Connections.pdf
- Type:
- Date:
- 13 December 2023
- Size:
- 4.9 MB
-
Connagill Cluster Booklet November 2023.pdf
- Type:
- Date:
- 21 November 2023
- Size:
- 5.6 MB
Environmental Impact Assessment (EIA) - Planning Statement
-
Strathy Wood Grid Connection - Planning Statement.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 6.1 MB
EIA - Non-Technical Summary
-
Strathy Wood Grid Connection - Non-Technical Summary.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 6.9 MB
EIA - Volumes
-
Vol 1 - Chapter 1 - Introduction and Background.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 386.7 KB
-
Vol 1 - Chapter 10 - Cultural Heritage.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 358.8 KB
-
Vol 1 - Chapter 11 - Traffic and Transport.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 374 KB
-
Vol 1 - Chapter 12 - Forestry.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 315.2 KB
-
Vol 1 - Chapter 13 - Socio-Economic, Tourism and Recreation.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 370.2 KB
-
Vol 1 - Chapter 14 - Schedule of Mitigation.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 346.5 KB
-
Vol 1 - Chapter 2 - The Routeing Process and Alternatives.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 1 MB
-
Vol 1 - Chapter 3 - The Proposed Development.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 1013.7 KB
-
Vol 1 - Chapter 4 - Scope and Consultation.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 365.8 KB
-
Vol 1 - Chapter 5 - EIA Process and Methodology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 264.7 KB
-
Vol 1 - Chapter 6 - Landscape and Visual.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 864.6 KB
-
Vol 1 - Chapter 7 - Ecology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 722.7 KB
-
Vol 1 - Chapter 8 - Ornithology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 795.2 KB
-
Vol 1 - Chapter 9 - Soils Geology and Water.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 532.1 KB
-
Vol 1 - Main Report - Front Cover, Contents and Glossary.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 9.2 MB
-
Vol 2 - Figure 1.1 - Location Plan.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.4 MB
-
Vol 2 - Figure 10.1 - Cultural Heritage Assets.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.4 MB
-
Vol 2 - Figure 12.1 - Forestry Study Area.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 1.3 MB
-
Vol 2 - Figure 12.2 - Forestry Felling.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3 MB
-
Vol 2 - Figure 12.3 - Aerial Imagery of Baseline Forestry.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.7 MB
-
Vol 2 - Figure 2.1 - Route Options.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.4 MB
-
Vol 2 - Figure 2.2 - Proposed Route and Alignments Options.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.1 MB
-
Vol 2 - Figure 3.1 - The Proposed Development.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.4 MB
-
Vol 2 - Figure 3.2 - Schematic of Tower 19 Arrangement with new trident wood poles.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 445.5 KB
-
Vol 2 - Figure 6.1 - ZTV to 10km with Designations.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.9 MB
-
Vol 2 - Figure 6.2 - Landscape Character Types.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.4 MB
-
Vol 2 - Figure 6.3 - Visual Receptors.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.1 MB
-
Vol 2 - Figure 6.4 - Cumulative Developments.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.2 MB
-
Vol 2 - Figure 7.1 - Ecology Study Area.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 1.6 MB
-
Vol 2 - Figure 7.2 - Ecological Designated Sites.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.2 MB
-
Vol 2 - Figure 7.3 - Protected Species Survey Area.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.9 MB
-
Vol 2 - Figure 7.4 - Habitats Survey Area.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.3 MB
-
Vol 2 - Figure 7.5 - Static Bat Survey Locations.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.8 MB
-
Vol 2 - Figure 7.7 - Habitats Survey Results.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 7.3 MB
-
Vol 2 - Figure 8.1a - SNorth 2016-19 & 2021 Orn Survey Areas.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.8 MB
-
Vol 2 - Figure 8.1b - SNorth 2021 Orn Survey Areas VPs and viewsheds.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.5 MB
-
Vol 2 - Figure 8.1c - SSouth Grid 2022 VP 1 & 2 Locations and Viewsheds.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.4 MB
-
Vol 2 - Figure 8.2a - SWood Grid Connection 2018-19 Orn Survey Areas.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.4 MB
-
Vol 2 - Figure 8.2b - SWood Grid Connection 2022 Orn Survey Areas.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.3 MB
-
Vol 2 - Figure 8.3 - Ornithological Designated Sites.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.1 MB
-
Vol 2 - Figure 8.4a - SNorth 2021 OM Results Wildfowl Flights and Breeding Territories.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.5 MB
-
Vol 2 - Figure 8.4b - SNorth 2021 OM Results Wader Flights and Breeding Territories.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.4 MB
-
Vol 2 - Figure 8.4c - SNorth 2021 OM Results Osprey Flights.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.7 MB
-
Vol 2 - Figure 8.4d - SSouth Grid Connection 2022 Breeding Season Target Species Flights.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.2 MB
-
Vol 2 - Figure 8.5a - SWood Grid Connection 2018-19 Non-breeding Season Target Species Flights.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.6 MB
-
Vol 2 - Figure 8.5b - SWood Grid Connection 2019 Breeding Season Target Species Flights Exc HH.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.8 MB
-
Vol 2 - Figure 8.5c - SWood Grid Connection 2019 MBBS Results Wader Territories.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.3 MB
-
Vol 2 - Figure 8.5d - SWood Grid Connection 2022 SBBS Results Wildfowl and Wader Territories.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.5 MB
-
Vol 2 - Figure 9.1 - Local Hydrology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3 MB
-
Vol 2 - Figure 9.2 - Soils.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.9 MB
-
Vol 2 - Figure 9.3 - Superficial Geology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.3 MB
-
Vol 2 - Figure 9.4 - Peatland Classification.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4 MB
-
Vol 2 - Figure 9.5 - Bedrock Geology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.3 MB
-
Vol 2 - Figure 9.6 - Regional Hydrogeology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.8 MB
-
Vol 2 - Figure 9.7 - Groundwater Vulnerability.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.9 MB
-
Vol 2 - Figures - Front Cover and Contents.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.8 MB
-
Vol 3a - Figure 1a - Visualisation Location 1 - Bowside.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.5 MB
-
Vol 3a - Figure 1b - Visualisation Location 1 - Bowside.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.5 MB
-
Vol 3a - Figure 1c - Visualisation Location 1 - Bowside.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 2.6 MB
-
Vol 3a - Front Cover and Contents.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.8 MB
-
Vol 3b - Figure 1a - Visualisation Location 1 - Bowside.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.3 MB
-
Vol 3b - Figure 1b-c - Visualisation Location 1 - Bowside.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 7.3 MB
-
Vol 3b - Figure 1d-e - Visualisation Location 1 - Bowside.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.1 MB
-
Vol 3b - Front Cover and Contents.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4 MB
-
Vol 4 - Appendicies - Front Cover and Contents.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 9.2 MB
-
Vol 4 - Appendix 1.1 - ECU Screening Opinion - June 2019.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 412 KB
-
Vol 4 - Appendix 11.1 - Transport Assessment.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 923.7 KB
-
Vol 4 - Appendix 11.2 - Draft Outdoor Access Management Plan.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 6 MB
-
Vol 4 - Appendix 12.1 - Forestry Photographic Record.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 1.5 MB
-
Vol 4 - Appendix 13.1 - SSEN Transmission Overview.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 391.9 KB
-
Vol 4 - Appendix 3.1 - Indicative Tower and Pole Schedule.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 154.9 KB
-
Vol 4 - Appendix 3.2 - Access Track Schematic.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 268 KB
-
Vol 4 - Appendix 3.3 - CSE Compound - Footprint of Proposed Earthworks.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 713.2 KB
-
Vol 4 - Appendix 3.4 - Outline Site Restoration Plan.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 1 MB
-
Vol 4 - Appendix 3.5 - SSEN GEMPs.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 3.2 MB
-
Vol 4 - Appendix 3.6 - SSEN SPPs.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.7 MB
-
Vol 4 - Appendix 3.7 - Outline CEMP.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 154.5 KB
-
Vol 4 - Appendix 4.1 - Public Consultation Report.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 7.9 MB
-
Vol 4 - Appendix 4.2 - Strathy Wood Grid Connection - Scoping Report - January 2024.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.5 MB
-
Vol 4 - Appendix 4.3 - ECU Scoping Opinion - August 2024 (Redacted).pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 6.9 MB
-
Vol 4 - Appendix 4.4 - Scoping Matrix.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 821.1 KB
-
Vol 4 - Appendix 4.5 - THC Pre-App Advice.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 4.7 MB
-
Vol 4 - Appendix 4.6 - Gate Check Report - September 2024.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 5.4 MB
-
Vol 4 - Appendix 5.1 - EIA Team Details.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 198.1 KB
-
Vol 4 - Appendix 6.1 - Technical Methodologies for Visual Representation.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 340.7 KB
-
Vol 4 - Appendix 6.2 - Visual Assessment Tables.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 288.2 KB
-
Vol 4 - Appendix 7.1 - Wildlife Legislation & Planning Policy.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 207.5 KB
-
Vol 4 - Appendix 7.2 - EcIA Methodology.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 230.7 KB
-
Vol 4 - Appendix 7.3 - Habitats Technical Report.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 294.3 KB
-
Vol 4 - Appendix 7.5 - Bat Technical Report.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 794 KB
-
Vol 4 - Appendix 7.6 - Shadow HRA for the Caithness and Sutherland Peatlands SAC.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 875.5 KB
-
Vol 4 - Appendix 7.7 - Flow Country WHS Assessment.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 429.1 KB
-
Vol 4 - Appendix 7.8 - Connagill Cluster Outline HMP.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 9.9 MB
-
Vol 4 - Appendix 8.1 - Ornithology Technical Report.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 610.3 KB
-
Vol 4 - Appendix 9.1 - Peat Landslide Hazard Risk Assessment .pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 8 MB
-
Vol 4 - Appendix 9.2 - Outline Peat Management Plan.pdf
- Type:
- Date:
- 12 November 2024
- Size:
- 6.1 MB
FAQs
FAQs
-
SSEN Transmission is responsible for maintaining and investing in the electricity transmission network in the north of Scotland and our network extends over a quarter of the UK’s land mass, crossing some of its most challenging terrain.
Our operating area is home to vast renewable energy resources, and this is being harnessed by wind, hydro and marine generation. Working closely with National Grid Electricity System Operator (the 'ESO'), we enable electricity generators to connect to the transmission system, allowing the electricity generated by them to be transported to areas of demand across the country. -
Following a minority stake sale which completed in November 2022, SSEN Transmission is now owned 75% by SSE plc and 25% by Ontario Teachers’ Pension Plan Board.
SSE plc sold its UK domestic electricity and gas retail business, along with domestic energy services to OVO Energy in January 2020 and no longer manages these customer accounts.
-
It’s the highest voltage electricity network in the UK – the ‘motorway network’ of the energy world. It transmits large quantities of electricity over long distances via wires carried on a system of mainly metal towers (pylons) and large substations. Transmission voltages in Scotland are 132kV, 275kV and 400kV. Larger generation schemes usually connect to the Transmission system.
The lower voltage parts of the system are called distribution networks. In Scotland, these local networks operate below 132kV whereas in England the distribution network includes 132kV.
-
As a stakeholder-led business, throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing new projects, we want to understand what local people think about our plans.
We always endeavour to take the time to discuss our proposals with local community councils and the wider affected community and to carry out engagement throughout each of the development stages, listening to feedback before finalising project plans. The feedback we receive is vital to help us develop proposals that reflect the views of a variety of stakeholder.
-
To find out more about a project, visit our project web pages which can be searched by location or area. Each project has a dedicated Community Liaison Manager that you can contact. You can find their contact details in the individual project pages, where you can also sign up to project updates.
Project Contacts
Lisa Marchi | Community Liaison Manager
Richard Loerns | Land Manager
Address: 1 Waterloo Street, Glasgow, G2 6AY
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.